London Borough of Hammersmith & Fulham
Brownfield land
There is a problem
- 15 entries must have valid URIs
LBHF019
- SiteReference
- LBHF019
- SiteNameAddress
- Imperial College, 80 Wood Lane, W12 0TT
- Deliverable
- yes
- HazardousSubstances
- Hectares
- 2.27
- MinNetDwellings
- NetDwellingsRangeFrom
- 132
- NetDwellingsRangeTo
- 132
- OwnershipStatus
- PermissionDate
- 2012-12-21
- PermissionType
- full-planning-permission
- PlanningHistory
- PlanningStatus
- permissioned
- SiteplanURL
- GeoX
- POINT(-0.225642 51.516035)
- GeoY
- POINT(-0.225642 51.516035)
- Notes
- Hybrid planning application (part detailed/part outline) for the Imperial West ('Woodlands') site comprising detailed application for 3 buildings: (1) academic building (9 storeys/23,077m2 GEA) (Class D1) including health research, day nursery (1,029sqm GIA) (Class D1) and restaurant facilities (2,127sqm GIA) (Class A3); (2) office and research units (part 6, part 12 storeys/22,528m2 GEA) (Class B1) of which 77sqm (GIA) Class A1/A3 and 313sqm (GIA) Class A3; and (3) residential tower (Class C3) (35 storeys/20,297m2 GEA) of floorspace in total, 192 units (59 of which are key worker units) and 319sqm (GIA) of A1/A3 floorspace at ground floor level; along with an access road, car/cycle parking (part basement and part surface), ancillary plant and landscaping; and Outline application for the erection of 3 additional buildings comprising a hotel (13 storeys/maximum 14,500m2 GEA) (Class C1) including 1,080sqm (GIA) restaurant (Class A1/A3) and 850sqm (GIA) fitness centre (Class D2); and 2 further buildings to be used for education (7 storeys/maximum 6,500m2 GEA) (Class D1) of which 600sqm (GIA) Class A1/A3; and office (Class B1) and administrative uses (Part 3, part 5 storeys/maximum 5,900m2 GEA); and demolition of existing sports hall building (Class D1) and existing office (Class B1). (GEA - Gross External Area; GIA - Gross Internal Area).
- OrganisationLabel
- OrganisationURI
- LastUpdatedDate
- 2021-01-25
- FirstAddedDate
- 2021-01-25
- EndDate
How to fix this issue
Your dataset is missing the PlanningHistory column.
The Brownfield land guidance explains how to fix the issue:
PlanningHistory
Enter links to any web pages that give information on the site’s planning history (include the “http://” or “https://” prefix). Fields in this column can contain more than one link, as long as you separate multiple links with the pipe character (‘|’). You can leave this field blank.
How to improve London Borough of Hammersmith & Fulham’s data
- Fix the errors indicated
- Use the check service to make sure the data meets the standard
- Publish the updated data on the endpoint URL